Friday, November 8, 2024

Shore to ship power infrastructure to be boosted – Maritime Gateway – South Asia’s Premier Shipping and Logistics News Portal

Must read

So far, shore power is being used extensively for vessels with moderate power requirements—less than 50 to 100 KW. For mega vessels — 100 KW up to 10 to 15 MW — the grid capacity, among other things, must be upgraded.

Latest article