Tuesday, November 5, 2024

New tenant coming to the Farm Shopping Center | Commercial building permits

Must read

This weekly update lists new commercial construction, expansions and enlargements of more than $80,000 in Tulsa. Descriptions of work are described where listed.

Commercial building permits are provided by the City of Tulsa on a weekly basis after entities provide information on upcoming building plans.

They are listed by owner, tenant or building name. Listed cents are rounded up or down to the nearest dollar.

The Tulsa World runs this weekly list to inform readers of upcoming or planned projects. For questions, email business@tulsaworld.com.

Cat Cafe Tulsa5203 S Sheridan Road East (the Farm Shopping denter), alteration (renovation of previous Great Harvest Bread building at 5203 S. Sheridan Road. Use type will remain food service, but will be renovated as a coffee shop with cat lounge), $648,037.

People are also reading…

Urgent Care 2809 E 101st St. South, alteration (remodel interior of building to be a veterinary clinic), $615,223.

Edward Jones10119 E. 80th St. South unit B, alteration (tenant improvement to existing structure), $351,175.

8200 Trade Center8276 E. 41st St. South, alteration, $386,470.

Ulta Beauty4915 E. 41st St. South, alteration (interior remodel of existing mercantile building), $2,214,719.

No entity listed4610 S. Memorial Drive East, addendum, $169,542.

Seventyfirst Flats737 W. 71st St. South, new multi-family (three-story interior corridor 36-unit apartment building with associated site work), $6,113,118.

Cheever’s Cafe1345 E. 15th St. South unit A1, alteration (buildout of a 3,750-square-foot restaurant within an existing building. The restaurant will have a tow-hour separation, and fire suppression will be added to the restaurant portion of the building), $836,213.

Nexus Energy Partners6120 S. Yale Ave. East unit 800, alteration-priority, $2,019,826.

2300 Riverside2300 S. Riverside Drive East unit 17G, alteration (interior remodel), $480,043.

W 7th St Apartments17 W. 7th St. South, alteration (14-story building being converted from a hotel to apartments. Project intended to be design/build with phases of remodeling. Permit submittal contains all drawings to begin Phase I to remodel the 5th floor through the 14th floor. There are no structural modifications to the building taking place. Future Drawing Submittals will occur for the 1st, 2nd, 3rd, 4th, and 15th floors, which also do not contain Structural modifications), $16,448,945.

Zarrow Pointe 2025 E. 71st St. South unit 101, foundation only (foundation for four-story addition to existing assisted living facility), $912,514.

The Tulsa World is where your story lives

The Tulsa World newsroom is committed to covering this community with curiosity, tenacity and depth. Our passion for telling the story of Tulsa remains unwavering. Because your story is our story. Thank you to our subscribers who support local journalism. Join them with limited-time offers at tulsaworld.com/story.



Latest article