This weekly update lists new commercial construction, expansions and enlargements of more than $80,000 in Tulsa. Descriptions of work are described where listed.
Commercial building permits are provided by the City of Tulsa on a weekly basis after entities provide information on upcoming building plans.
They are listed by owner, tenant or building name. Listed cents are rounded up or down to the nearest dollar.
The Tulsa World runs this weekly list to inform readers of upcoming or planned projects. For questions, email business@tulsaworld.com.
Greenwood Entrepreneurial @ Moton (GEM)
609 E. Pine St. North, alteration (new roof structure, dormer windows, and roof membrane on existing structure), $794,099.
The former hospital complex on Tulsa Development Authority-owned property will be converted into a roughly $9 million Greenwood Entrepreneurship Incubator @ Moton. The city building permit lists the address as 609, but the address of the main facility will be located at 660 E. Pine St.
People are also reading…
1437 S. Boulder Ave. unit 1100, alteration-priority, $4,380,712.
6120 S. Yale Ave. East, alteration-priority (10th and 11th floors), $682,747.
University of Oklahoma Schusterman Center
4502 E. 41st St. South, alteration (interior remodel to convert an existing computer lab classroom into a suite of physical research spaces), $304,486.
101 E. 2st St. South, alteration (9th floor limited remodel BOK Financial), $1,557,623.
2161 S. 91st Ave. East, alteration, $484,573.
5919 E. 12th St. South, alteration (interior remodel), $169,105.
1241 N. Osage Drive West, alteration (proposed scope of work provides life safety updates to an existing vacant tenant space. The new tenant is not yet determined but will be permitted separately for occupancy), $613,212.
1247 N. Osage Drive West, alteration (proposed scope of work provides life safety updates to an existing vacant tenant space. The new tenant is not yet determined but will be permitted separately for occupancy), $404,376.
Capital Market Properties
2756 S. Memorial Drive East, alteration, $194,169.
4200 E. Skelly Drive South Suite 600, alteration (interior remodel), $1,433,795.
1100 E. 4th St. South, addition (metal pre engineered add on to existing structure), $291,658.